Excelsus IQ Complete Operating Manual
This is the complete operating manual for running a print company inside Excelsus IQ.
It combines the maintained guide sources for:
- setup
- go-live ownership
- estimator training
- production-floor operation
- reporting and intelligence
How To Use This Manual
Use this manual in three ways:
- as the implementation reference while setting up the system
- as the training document for estimators, managers, and floor staff
- as the printable master manual for operating reviews and onboarding
Manual Structure
The major sections below are generated from the maintained source guides in docs/.
When the source guides are updated, regenerate this manual and PDF so the combined reference stays current.
Print Shop Setup Guide
This guide is written specifically for printing companies using Excelsus IQ as their estimating, job, scheduling, purchasing, invoicing, and reporting system.
It is intentionally detailed. The goal is to give you one setup order that makes the program work the way a real print shop works.
What This System Should Be The Source Of Truth For
For a print company, this system should become the source of truth for:
- customer defaults
- estimating inputs
- production rates
- machine and finishing costs
- production sequencing
- rush and prepress charging
- order scheduling
- operator actual labor cost
- purchasing and receiving
- invoicing and reporting
If the same information is entered differently in multiple places, the system will feel inconsistent. The cleanest setup is:
- Build the shop structure in Settings first.
- Create clean customer records with correct defaults.
- Quote from the catalog instead of typing ad hoc values whenever possible.
- Convert approved quotes into orders.
- Let scheduling and time tracking run from those orders.
Recommended Setup Order
Set the system up in this order:
- Company settings
- Team members and roles
- Accounting basics
- Catalog categories and vendors
- Materials
- Machines
- Processes
- Hardware
- Labor rates and margin groups
- Prepress charges
- Rush charges
- Production departments
- Shop hours and resource availability
- Operator skills
- Job flow rules
- Process sequences
- Estimating defaults and volume discounts
- Customers and contacts
- Optional inventory
- Purchase orders, scheduling, time, invoicing, and reports
Do not start by building quotes first. Quotes work best after customers, materials, machines, processes, prepress, rush rules, and departments are already in place.
Before You Start
Gather this information before setup:
- company legal name, display name, slug, timezone
- logo URL and primary brand color
- order, PO, and invoice prefixes
- shop working days and hours
- holiday closures
- list of departments
- list of machines with pricing model and speed
- list of finishing processes
- list of operators and their actual hourly cost
- customer tax defaults, commission rules, discounts, and quote loading rules
- material purchasing data
- margin targets
- tax rates
- overhead values
- default prepress charges
- rush policy
1. Company Settings
Go to Settings > Company.
Company Info
Use Company Info to set:
- Company Name
- Company Slug
- Timezone
Recommendations for print shops:
- Use the real operating company name that should appear on documents.
- Use the timezone the production floor actually runs on.
- Do not leave timezone generic if your team, due dates, and schedule are local.
Branding And Logo
Use Branding & Logo to set:
- Logo URL
- Primary Brand Color
This matters for customer-facing documents and future white-label output. If quotes and invoices should look like your shop, set this early.
Document Numbers And Defaults
Use Document Numbers to set:
- Order Prefix
- Purchase Order Prefix
- Invoice Prefix
- Show Cost On Internal PDF
- Show Margin On Internal PDF
- Require Proof Approval Before Production
- Auto Generate Schedule On Order
Recommended starting values for most print companies:
- Order Prefix:
ORDorJOB - Purchase Order Prefix:
PO - Invoice Prefix:
INV - Show Cost On Internal PDF: on
- Show Margin On Internal PDF: on
- Require Proof Approval Before Production: on if customer proof approval is mandatory
- Auto Generate Schedule On Order: on
If your shop never wants production scheduled until someone manually reviews the job, turn off auto-generate schedule. Otherwise leave it on.
2. Team Members And Roles
Go to Settings > Users & Access.
Create every real person who affects quoting, customer ownership, production, or reporting.
Available roles are:
- Owner
- Admin
- Production Scheduler / Manager
- Sales Rep
- CSR
- Sales Rep + CSR
- Operator
Actual Labor Rate Per Hour
Set Actual Labor Rate Per Hour for each person if you want time tracking and actual costing to reflect real labor cost.
This is important for print shops because:
- operators often have different actual wages
- installers may cost more than production helpers
- prepress staff may cost more than general operators
If you skip this, the system falls back to broader labor-rate assumptions instead of using person-specific actual cost.
Recommended Initial Role Mapping
Use this as a practical starting point:
| Shop Role | System Role |
|---|---|
| Owner / GM | Owner |
| Office admin with broad access | Admin |
| Production lead or scheduler | Production Scheduler / Manager |
| Outside or inside sales | Sales Rep |
| CSR / project manager | CSR |
| Salesperson who also runs jobs | Sales Rep + CSR |
| Press operator / finisher / installer | Operator |
Report Access
Turn on report permissions only for people who need them:
- Standard Reports
- Report Builder
- Accounting Reports
- Dashboards
- Invoice Reports
3. Accounting Basics
Go to Settings > Accounting.
Do this before heavy quoting so tax and profitability behave correctly.
Tax Rates
Use Tax Rates to load or enter the tax rates you actually charge.
Each rate can include:
- county
- municipality
- state rate
- county rate
- city rate
- combined rate
- effective date
Best practice:
- build tax rates before customer setup
- assign the correct default tax rate on each taxable customer
- use tax-exempt only when the customer truly is exempt and the exemption number is on file
Accounting Preferences
Use Preferences to set:
- payment methods accepted
- late fee percent
- grace period
- fiscal year start month
- export format
- default income account
- default COGS account
- aging report email settings
This is mostly accounting behavior, but printing companies should still set it up early so invoices and reporting are consistent.
Overhead And Profit
Use Overhead & Profit to enter the real monthly burden of running the shop:
- rent or mortgage
- utilities
- insurance
- admin and office salaries
- sales base salaries
- management salaries
- software
- marketing
- other fixed cost
- total production floor square footage
- total shop power
- working days per month
- working hours per day
- labor burden factor
- target monthly revenue
- target gross margin
- target net profit
- unassigned overhead allocation method
For print shops, this section matters because machine cost analysis and profitability are only credible if these values are not fake.
Good starting principles:
- use realistic wages, not ideal wages
- use conservative throughput
- use actual occupancy cost
- use a labor burden factor that includes payroll burden and benefits
After overhead is set, review each major machine in its cost calculator and compare the current sell rate against the suggested rate.
4. Catalog Categories
Go to Settings > Catalog > Categories.
Categories are for organizing the catalog. They are not the production department.
Use categories for reporting and catalog structure, such as:
- Materials / Vinyl
- Materials / Banner
- Materials / Rigid
- Materials / Paper
- Machines / Wide Format
- Machines / Digital Press
- Processes / Cutting
- Processes / Laminating
- Hardware / Grommets
- Hardware / Frames
Important:
Categoryis catalog organization.Production Departmentis scheduling.
Do not try to use category as your job-flow department.
5. Vendors
Go to Settings > Catalog > Vendors.
Create vendors before materials, outsourced processes, or hardware so those records can point to the right supplier.
Recommended vendor data:
- vendor name
- account number
- terms
- primary contact
- phone
- address
- notes
Typical print-shop vendors:
- media vendors
- laminate vendors
- substrate vendors
- hardware suppliers
- outsourced finishers
- freight and installation partners
6. Materials
Go to Settings > Catalog > Materials.
Materials represent the physical stock you buy and consume.
The system supports two stock types:
SheetRoll
Laminates are usually created as Roll materials, not as a separate stock type.
What To Create As Materials
Common examples:
- adhesive vinyl rolls
- banner rolls
- canvas rolls
- poster paper rolls
- foam board sheets
- coroplast sheets
- ACM sheets
- styrene sheets
- magnetic material
- laminate rolls
Key Material Fields
Set these carefully:
- Category
- Name
- SKU
- Vendor
- Stock Type
- Sheet Width, Height, Cost for sheet stock
- Roll Width, Length, Cost for roll stock
- Unit Of Measure
- Waste Factor %
- Bleed
- Gutter
- Trim Margin
- Weight Per Sq Ft
- Color
- Finish
- Thickness
- Notes
How Print Shops Should Think About Material Setup
For wide-format shops:
- create separate materials for each common roll width and finish
- do not combine different widths into one record
- create separate laminate material records by finish and width
- use realistic waste, especially for short-run jobs
For sheetfed shops:
- create each sheet size separately
- create separate coated, uncoated, synthetic, and specialty stocks
- use actual sheet cost, not carton cost unless you convert it
For rigid-media shops:
- create each substrate thickness and size separately
- do not combine 3 mm and 6 mm board in one material
Inventory Note
If you plan to use the Inventory module, mark materials for inventory tracking and maintain accurate receipts and adjustments. If you do not track stock, you can still use materials for quoting only.
7. Machines
Go to Settings > Catalog > Machines.
Machines are the main production-cost engine for print shops. Build these carefully.
Machine Setup Should Include
- Category
- Production Department
- Name
- Machine Code
- Active flag
- Pricing Model
- Rate Per Hour, Per Click, Per Sq Ft, Minimum Charge, or other pricing inputs
- Setup Time
- Max Print Width
- Max Print Length
- Speed in the throughput unit that makes sense
- Requires Operator
- Operator Rate Per Hour
- Notes
Category Versus Department
Use them differently:
Category: how the machine is grouped in the catalogProduction Department: where the machine belongs in scheduling
Example:
- Category:
Wide Format Printers - Department:
Printing
Choosing A Pricing Model
Use the pricing model that matches how you actually sell and estimate:
hourlyfor machines quoted by timeclickfor click-based devicessqftfor square-foot pricingper_piecefor equipment where per-piece logic makes more senseflatfor flat setup-style chargeslnftwhen linear-foot pricing is the right basis
Choosing A Speed Unit
Use the speed field that matches how the machine actually runs:
Speed (sq ft/hr)for many printers, routers, laminators, and broad-area finishing equipmentSpeed (linear ft/hr)for roll workflows where length is the better driverSpeed (pieces/hr)for cutters, folders, pack-out stations, or any piece-based step
If a printer is charged hourly and output is really based on square feet, do not force pieces/hr. Use sq ft/hr.
Good Machine Examples
Wide-format printer:
- Department: Printing
- Pricing model: hourly or sqft
- Speed: sq ft/hr
- Requires operator: yes
Roll laminator:
- Department: Laminating
- Pricing model: hourly or lnft
- Speed: linear ft/hr or sq ft/hr
Flatbed cutter:
- Department: Cutting
- Pricing model: hourly or per_piece
- Speed: pieces/hr or sq ft/hr depending on how you sell it
Pack-out bench:
- Department: Packing
- Pricing model: hourly
- Speed: pieces/hr
Machine Cost Calculator
For each major machine, open the cost calculator and fill in:
- purchase price
- salvage value
- useful life
- maintenance
- equipment insurance
- machine footprint
- power draw
- utility rate
- voltage
This helps determine whether your machine sell rate is actually covering burden.
8. Processes
Go to Settings > Catalog > Processes.
Processes are non-material production charges and production steps.
Common print-shop processes:
- lamination
- mounting
- contour cutting
- trimming
- sewing
- hemming
- grommeting
- drilling
- weeding
- transfer tape
- kitting
- packing
- shipping prep
- installation
- design
- file repair
- press proof
Key Process Setup Fields
- Category
- Production Department
- Name
- Process Code
- Pricing Model
- Rate
- Setup Charge
- Minimum Charge
- Time Per Unit
- Is Outsourced
- Vendor
- Outsource Cost
- Notes
Department Assignment Matters
If you want auto-scheduling to run by department order instead of by machine-specific logic, assign every machine and every schedule-relevant process to a production department.
Examples:
- contour cut process -> Cutting
- laminate process -> Laminating
- hand apply tape -> Handwork
- kitting process -> Kitpacking
- boxing process -> Packing
- delivery staging -> Shipping
Outsourced Processes
Use Is Outsourced for work such as:
- trade bindery
- outsourced installs
- specialty finishing
- embroidery
- outsourced die cutting
If it is outsourced, set the vendor and outsource cost.
9. Hardware
Go to Settings > Catalog > Hardware.
Use hardware for non-stock accessories or attachable billable components such as:
- grommets
- standoffs
- easel backs
- frames
- hooks
- pole pockets if priced as an add-on piece
- cable kits
- mounting brackets
- zip ties if you bill them
Set:
- category
- name
- vendor
- unit of measure
- cost per unit
- optional sell price per unit
- minimum quantity
10. Labor Rates
Go to Settings > Catalog > Labor Rates.
Use this for role-level labor assumptions and defaults.
Examples:
- Prepress Artist
- Press Operator
- Finishing Operator
- Installer
- CSR
Then, for higher accuracy on actual time cost, also set Actual Labor Rate Per Hour on each user record.
The clean model is:
- labor rate table = shop-level standard assumptions
- user labor rate = person-specific actual cost
11. Margin Groups
Go to Settings > Catalog > Margin Groups.
Create margin groups that reflect how your shop prices different work.
Example structure:
| Margin Group | Use For |
|---|---|
| Standard | Normal retail work |
| Premium | Rush, specialty, complex work |
| Wholesale | Trade customers and resellers |
| Custom | Special-account pricing |
Each margin group should have:
- margin percent
- minimum dollar margin
- description
These can then be assigned to customers and used as the base estimating posture.
12. Prepress Charges
Go to Settings > Catalog > Prepress Charges.
This is where you build reusable quote-time prepress options.
Recommended Core Prepress Types
At minimum, most print shops should create:
Standard PrepressFile Prep
Recommended setup:
Standard Prepress- pricing model:
flat - auto apply to each item: on
- show separately on quote: based on your preference
File Prep- pricing model:
per_version - auto apply to each item: on
- show separately on quote: based on your preference
How it works in the quote builder:
- standard prepress applies once per quote item
- file prep multiplies by the number of versions or files on that item
You can also create optional prepress types for:
- color correction
- variable data setup
- straight reprint
- reprint with change
- CNC file setup
- proof creation
- design time
Best Practice
Make the default automatic charges represent what truly happens on almost every job.
Do not auto-apply rare charges. Only auto-apply the baseline shop behavior.
13. Rush Charges
Go to Settings > Catalog > Rush Charges.
Rush rules are order-level or quote-level urgency charges.
Each rush rule has:
- name
- description
- percent charge
- minimum charge
- sort order
- active flag
The rule uses whichever dollar value is higher:
- the percentage-based rush amount
- the minimum rush charge
Example rush policy:
| Rule | Percent | Minimum |
|---|---|---|
| Same Week Rush | 10% | $150 |
| 48 Hour Rush | 20% | $300 |
| Next Day Rush | 35% | $500 |
If your rush policy depends on promise date, create the few standard rules you actually sell instead of making every quote unique.
14. Production Departments
Go to Settings > Production > Departments.
Departments are now the right place to define production flow at a print-shop level.
This is where you set the departments the scheduler should sequence through.
Recommended department list for many print shops:
- Printing
- Cutting
- Laminating
- Mounting
- Sewing
- Finishing
- Handwork
- Kitpacking
- Packing
- Shipping
- Installation
Set Sort Order in the order you want work to generally progress.
Example:
| Sort Order | Department |
|---|---|
| 10 | Printing |
| 20 | Laminating |
| 30 | Cutting |
| 40 | Mounting |
| 50 | Finishing |
| 60 | Handwork |
| 70 | Kitpacking |
| 80 | Packing |
| 90 | Shipping |
Important:
- categories organize records
- departments drive production flow
15. Shop Hours
Go to Settings > Production > Shop Hours.
Set:
- shop open time
- shop close time
- working days
Then add closures for:
- holidays
- planned downtime
- maintenance windows
- plant shutdowns
- resource-specific blackout dates
If your shop runs a real second shift but the system is only set to daytime hours, scheduling will look wrong. Set hours to match reality.
16. Production Resource Schedule
Go to Settings > Production > Production Resource Schedule.
Use this to override default availability for:
- machines
- schedule-relevant processes
This is where you reflect that a specific cutter, laminator, or process is only available on certain days or times.
Examples:
- install crew only available Monday through Friday
- second cutter only runs during first shift
- outsourced process unavailable on weekends
17. Schedule Settings
Go to Settings > Production > Schedule Settings.
Set:
- auto-schedule new orders when converted from quote
- auto-assign primary operator when scheduling
- respect operator skill level
- default view
- start hour
- end hour
- time slot size
- show completed tasks
- task overrun alert minutes
- warn if unscheduled days before due
Recommended starting settings:
- auto-schedule on: on
- auto-assign primary operator: on if your operator assignments are maintained
- respect operator skill level: on
- slot size: 15 or 30 minutes depending on shop complexity
18. Operator Skills
Go to Settings > Production > Operator Skills.
Assign operators to the machines they can run and set:
- skill level
- whether they are a primary operator
This matters if you want scheduling to assign the right person to the right equipment instead of treating every operator as interchangeable.
For example:
- Operator A: primary on flatbed printer
- Operator B: primary on roll printer
- Operator C: skilled on Zund, backup on laminator
19. Job Flow Rules
Go to Settings > Production > Job Flow Rules.
This is where you define the default production sequence.
Rules can sequence by:
- department
- machine type
- process category
For most print companies, department-based rules are the cleanest setup.
Example rule for a wide-format shop:
- Printing
- Laminating
- Cutting
- Handwork
- Packing
- Shipping
Example rule for rigid board work:
- Printing
- Mounting
- Cutting
- Finishing
- Packing
- Shipping
Best practice:
- use department steps for most of the flow
- only use machine-type or process-category steps when you truly need more specific logic
20. Process Sequences
Go to Settings > Production > Process Sequences.
Use process sequences when a specific kind of item needs a special flow that differs from the default rule.
Sequence templates can step by:
- department
- machine type
- exact process
Use this for recurring special workflows, such as:
- print -> laminate -> contour cut -> weed -> transfer tape -> pack
- print -> mount -> trim -> crate
- prepress -> proof -> print -> install
Do not overbuild this area at the start. Create the common default first, then add templates only for recurring exceptions.
21. Job Statuses
Go to Settings > Production > Job Statuses.
Set the shop language you want your team to use for orders and production states.
Keep statuses simple and operationally clear. Too many statuses usually create confusion instead of control.
22. Estimating Defaults
Go to Settings > Estimating > Default Values.
This page controls the quoting posture the system assumes when estimators start a new quote.
Set:
- Bleed
- Gutter
- Trim Margin
- Waste Factor
- Quote Valid For
- Default Margin Group
- Quote Loading %
- Auto-calculate imposition
- Show material cost breakdown in quote builder
- Show machine time in quote builder
- Warn when margin falls below minimum
- Require a machine selection on every quote line
Recommended starting point for many print shops:
- set bleed, gutter, and trim to your common production assumptions
- set waste to a realistic shop average, not a best-case guess
- set quote validity to what sales actually promises
- leave warning below margin on
- require machine selection if you want disciplined estimating
23. Volume Discounts
Go to Settings > Estimating > Volume Discounts.
Use volume discounts when your shop systematically discounts by:
- quantity
- square footage
- a specific customer
- a specific material or process context
Only build structured discounts you actually intend sales to follow. If everything is custom, this area becomes noise.
24. Customer Setup
Go to Customers > New Customer.
Customer setup is critical because quotes and orders inherit customer defaults.
What Quotes And Orders Pull From The Customer
The system uses the customer as the source of truth for:
- sales rep
- CSR
- default customer contact
- tax rate
- tax exempt status
- margin group
- commission percent
- automatic discount percent
- quote loading percent
- volume discount rule
If those values are wrong on the customer, your quotes and orders will start wrong.
Customer Record Best Practice
Set the following:
- Company Name
- Account Status
- Account Code
- Category
- Website
- Billing address
- Shipping address
- Sales Rep
- CSR
- Credit Terms
- Credit Limit
- Default Currency
- Default Sales Tax Rate
- Tax Exempt and exemption number if applicable
- Requires PO Number if the customer needs it
- Invoice and statement delivery rules
- Filing number if you use it
- Margin Group
- Margin %
- Minimum Margin $
- Commission %
- Automatic Discount %
- Quote Loading %
- Volume Discount Rule if applicable
- Notes
Contacts
After creating the customer, add customer contacts and make sure one is the default contact.
That default contact is what quote and order headers will use.
If you skip contacts, the quote can still exist, but the communication side of the record will be incomplete.
Practical Customer Types
Retail customer:
- standard or premium margin
- normal tax rule
- no automatic discount unless intentional
Trade reseller:
- wholesale margin group
- maybe no sales rep commission
- maybe automatic discount
Large corporate account:
- default CSR assigned
- requires PO number
- statement delivery configured
- agreed quote loading or account-specific discount if applicable
25. Creating Quotes The Right Way
Go to Quotes > New Quote.
Header Setup
At the top of the quote:
- choose the customer first
- confirm the correct default contact appears
- confirm the inherited sales rep and CSR
- fill in
Job Name
Job Name is the overall quote name. It should describe the entire job, even if the quote has multiple items.
Examples:
- Spring Window Campaign
- Trade Show Booth Package
- Fleet Graphics Rollout
- Restaurant Menu Reprint
Line Item Setup
Each quote line is an item within the overall job.
Use:
Item Descriptionfor what that specific item is- printing selection
- size
- quantity and versions breakdown rows
The system totals quantity from the quantity/version rows. Build those carefully.
Examples:
- 500 qty x 2 versions = 1,000 total units
- 5 signs x 4 files = 20 total units
Prepress In Quotes
If prepress types are set to auto-apply:
- standard prepress is applied once per item
- file prep is multiplied by versions or files
This is the correct behavior for many print shops and should be part of the default quote build if that reflects your real operation.
Materials, Machines, Processes, And Hardware
Use the catalog records you created earlier:
- material for stock
- machine for production charge
- processes for finishing, outsourced work, or production steps
- hardware for billable accessories
Try not to estimate with one-off numbers when a reusable catalog record should exist.
Rush In Quotes
If a rush rule applies, select the correct rush option so the quote reflects the urgency premium.
26. Converting Quotes To Orders
When a quote is approved:
- convert it to an order
- confirm the order due date
- confirm the shipping plan
- confirm the production sequence
If Auto Generate Schedule On Order is on, the schedule should build automatically from the order.
27. How Scheduling Should Work For A Print Shop
The clean intended flow is:
- quote line uses machine and process choices
- those records are assigned to production departments
- job flow rules sequence the departments
- the schedule creates tasks in department order
- operator skills and availability influence assignment
- operators clock time against those tasks
To make this work well:
- every important machine should have a department
- every schedule-relevant process should have a department
- shop hours must be real
- machine and process availability must be maintained
- primary operators should be assigned
If you leave department blank everywhere, scheduling falls back to older machine-type and process-category behavior. That can work, but department-based setup is the better shop-wide model.
28. Time Tracking And Actuals
Go to Time.
Operators can clock into scheduled tasks and clock out when they complete or pause work.
This is how the system captures:
- actual time
- actual labor cost
- actual task progress
For good actuals:
- make sure operators are assigned correctly
- make sure each operator has the right user role
- set actual labor rate on each operator if you want true labor cost
This is especially useful for:
- finding underquoted steps
- proving a department bottleneck
- checking whether setup assumptions are wrong
29. Inventory
Use the Inventory module only if you want stock-on-hand tracking.
Inventory becomes useful when you:
- buy common media in volume
- receive stock against POs
- want low-stock alerts
- want on-hand visibility by material
Inventory includes:
- dashboard
- tracked materials
- material detail
- manual adjustments
- low-stock and out-of-stock alerts
If your shop does not want perpetual inventory, you can ignore this module and still use materials for estimating.
30. Purchase Orders
Go to Purchase Orders.
Use POs when you need to buy:
- materials
- hardware
- outsourced production
POs can be linked to jobs and order lines, and received quantities can feed inventory and job costing.
Good use cases:
- special substrate for one customer job
- outsourced install
- trade bindery work
- custom hardware package
31. Invoices And Accounting Flow
After production and shipment:
- create invoice from the order
- confirm taxes and totals
- send using the customer's delivery rules
- record payment
Make sure:
- customer tax status is correct before quoting
- invoice prefix is set
- payment methods are configured
32. Reports
Use Reports after the operational setup is clean.
The report builder supports datasets for:
- jobs and orders
- invoices
- payments
- customers
- quotes
- purchase orders
- vendors
Practical reports for print companies:
- quotes won vs lost
- orders due this week
- revenue by customer
- balance due by customer
- purchases by vendor
- tax-exempt customers
- sales rep activity
For dashboard interpretation, quote intelligence, report-builder usage, and how to act on reporting data, use the separate Reporting And Intelligence Guide as the operating reference.
33. Recommended Department Model For Common Print Shops
Wide-Format Sign Shop
Recommended departments:
- Prepress
- Printing
- Laminating
- Cutting
- Mounting
- Finishing
- Packing
- Shipping
- Installation
Digital Print And Copy Shop
Recommended departments:
- Prepress
- Digital Printing
- Cutting
- Folding
- Binding
- Packing
- Shipping
Trade Show / Display Shop
Recommended departments:
- Prepress
- Printing
- Laminating
- Cutting
- Sewing
- Assembly
- Kitpacking
- Packing
- Shipping
- Installation
34. Recommended First Pass Setup For A Typical Wide-Format Shop
If you want a practical first-pass setup instead of perfect data, do this:
- Set company info, branding, prefixes, and auto-schedule on order.
- Add all employees and put actual labor cost on managers, prepress, operators, and installers.
- Add tax rates.
- Add vendors.
- Add your top 20 materials only.
- Add your main printer, laminator, cutter, and pack-out area.
- Add the core processes you sell every week.
- Add
Standard PrepressandFile Prep. - Add 3 rush rules.
- Add departments.
- Build one clean default job flow rule.
- Set shop hours and closures.
- Add operator skills.
- Add your margin groups.
- Set estimating defaults and overhead.
- Add your top customers and contacts.
- Build test quotes and one full test order.
That is enough to go live without overengineering phase one.
35. Common Setup Mistakes
Avoid these:
- using category instead of department for scheduling
- not assigning default customer contacts
- leaving customer tax and commission defaults blank
- creating materials without real dimensions and cost
- using unrealistic machine speeds
- forgetting machine departments
- forgetting process departments
- not creating a default job flow rule
- putting rare prepress charges on auto-apply
- skipping operator skills but expecting smart scheduling
- skipping overhead but expecting reliable profitability
- treating every exception as a permanent catalog record
36. Go-Live Checklist
Before your team starts using the system for real jobs, confirm all of this:
- company info is correct
- branding is correct
- numbering prefixes are correct
- tax rates are loaded
- overhead is entered
- payment preferences are entered
- all active staff are created
- operator labor rates are set
- main vendors are loaded
- key materials are loaded
- main machines are loaded
- key processes are loaded
- standard hardware is loaded
- margin groups exist
- prepress charges exist
- rush rules exist
- departments exist
- shop hours are correct
- closures are entered
- operator skills are entered
- at least one default job flow rule exists
- customers are loaded
- contacts are loaded and default contacts are set
- one full test quote has been created
- one quote has been converted to an order
- schedule generation has been tested
- one time entry has been clocked
- one PO has been created and received if using purchasing
- one invoice has been created
- one report has been reviewed
37. Best-Practice Operating Rules
Once you are live, keep these rules:
- Customer defaults are maintained by sales or CSR ownership.
- New materials, machines, processes, and hardware are added to the catalog before estimators improvise them repeatedly.
- Department assignments are mandatory on new machines and schedule-relevant processes.
- New recurring rush or prepress behavior is configured once in Settings instead of manually recreated on every quote.
- Operators clock into real tasks instead of using generic time buckets whenever possible.
- The shop reviews actuals against estimates every month and adjusts speeds, setup times, or rates when needed.
38. If You Want The Simplest Mental Model
For a print company, think of the system like this:
- Customers define who you are selling to and what defaults apply.
- Catalog defines what you can sell and how it costs.
- Estimating defines the default quoting logic.
- Production defines how work flows through the shop.
- Quotes define what the customer is being offered.
- Orders define what the shop is actually making.
- Time, purchasing, inventory, and invoicing define what actually happened.
- Reports tell you whether the business is working.
If you keep each area clean and do not mix responsibilities between them, the system will stay understandable as the shop grows.
39. Recent Platform Additions
The system has expanded materially since the earlier manual sections were written. The most important additions are below.
Production Library And Product Catalog
Catalog is now presented as Production Library.
This area now covers:
- materials
- laminate
- hardware
- machines
- processes
- import center
- product catalog templates
The Product Catalog is for prebuilt sellable products. A product template can now:
- prefill material, machine, process, hardware, and sizing assumptions
- support customer-optional or customer-locked usage
- support calculated pricing, fixed total pricing, or fixed unit pricing
- launch directly into quote or order entry
Use this when the shop sells repeatable items such as standard banners, posters, yard signs, kits, or recurring programs.
Inventory Control
Inventory now supports:
- on-hand quantity by material
- manual adjustments
- PO receiving into stock
- job allocations / reservations
- actual material usage capture
- spoilage / overrun capture
- cycle counts
- valuation reporting
The main daily planning report for materials is:
Inventory > Daily Requirements- direct route:
/inventory/requirements
That report shows, per job and component:
- job number
- customer
- due date
- component type
- material / laminate / hardware
- quantity needed
- job allocated quantity
- inventory reserved quantity
- current on-hand quantity
- current available quantity
Use this report every day for purchasing, staging, and production planning.
AI Platform
There is now a reusable AI layer with:
- provider and model settings
- prompt templates
- request / response logging
- structured JSON validation
- retries and fallback behavior
- human review queue
- feature-by-feature enable / disable controls
Current AI consumers include:
- natural-language quote intake
- win probability explanations
- promise date reasoning
AI setup lives in:
Settings > AI > InfrastructureSettings > AI > Prompt TemplatesSettings > AI > Review Queue
Predictive Promise Date
Promise dates are no longer only manual commitments.
The system now supports:
- optimistic date
- recommended date
- high-risk date
- capacity-based reasoning
- risk level
- manager override notes when committing earlier than recommended
Related settings live in:
Settings > Production > Schedule Settings
Dashboard And Production Meeting
The main dashboard is now a live operations command center.
It includes:
- KPI health strip
- production war board
- bottleneck / risk panel
- financial pulse
- fast links to due-today, due-tomorrow, all-orders, and production meeting
The daily review screen is:
Production Meeting- direct route:
/production-meeting
Use that screen at the 9:00 AM meeting to review all work due today and tomorrow.
Customer Portal
The customer portal now supports:
- live order stage tracking
- milestone timeline
- customer file upload
- reorder requests
Portal admin settings live in:
Settings > Customer Portal
Accounting Sync
Accounting integrations now have a dedicated framework for:
- QuickBooks Online
- Xero
- customer sync
- invoice sync
- payment sync
- invoice status sync
- reconciliation and conflict review
Settings live in:
Settings > Accounting > Integrations
Treat accounting sync as a controlled rollout until sandbox testing is complete.
40. Current System Setup Requirements
The sections above still describe the core shop setup sequence. The items below are the current platform requirements that must also be configured if you want the whole system to behave the way the code now supports.
Staff Login And Access
For production or owner use on the real deployed system, staff access should be configured through:
Settings > Team Members
Important rules:
- the owner should have an active username and password
- the owner should confirm the organization workspace slug before first staff login
- all real staff logins should be assigned to named users instead of sharing one login
- dashboard, reports, accounting, and admin access should be granted intentionally by role
On development systems, login can be relaxed temporarily. On real deployments, use staff login.
Module Navigation
Enabled modules and add-ons now appear as their own sections in the far-left workspace navigation.
That means staff should be trained to open module workflows from the left nav instead of hunting for scattered launch buttons inside settings pages.
Examples:
CRMPlanning ImposWegmans Small Format
Owners and admins should confirm that only the modules intended for the account are enabled, and that the team knows where each module now lives in the workspace shell.
Owner-Only Business Data Import
The system now includes an owner-only import center for initial data loading.
Use:
Settings > Business Data > Import Center
Supported bulk uploads:
- customers
- contacts
- quotes
- quote lines
- orders
- order lines
- invoices
- invoice lines
Recommended import order:
- customers and contacts
- quotes
- orders
- invoices
Do not start production work until the owner has confirmed that imported customers, contacts, open work, and invoices match the source system closely enough to operate from.
Microsoft 365 Outbound Email
Outbound email is now configured through Microsoft 365 Graph for the whole MIS.
Use:
Settings > Notifications > Email Delivery
Required values:
- from address
- quote request recipients
- Microsoft tenant ID
- Microsoft client ID
- Microsoft client secret
- Microsoft sender mailbox
This configuration is used across:
- quotes
- invoices
- CRM quote requests
- portal notifications
- digest-style system mail
Do not invite staff until a test email succeeds from this screen.
Job Status Setup
There are now two different status layers in the system:
- order lifecycle status
- production status
Order lifecycle status covers the whole job:
newin_productionon_holdreadyshippeddeliveredinvoicedcancelled
Production status is process-specific and comes from live tracked tasks:
Printing In ProgressPrinting PausedFinishing DoneProof / Approval
Production status setup lives in:
Settings > Production > Process Statuses
Use that page to map shop-facing production statuses to actual production processes. The order status remains the lifecycle rollup for the whole order.
NCR / Quality Setup
The MIS now includes NCR tracking.
Use:
Production > NCRs
NCRs can also be launched from:
- order detail
- item detail
- live task work ticket
Before using NCRs in production, confirm:
- the NCR schema is applied
- the NCR template PDF exists on the app server
- the upload root for NCR PDFs is writable
- the team understands when to use an NCR instead of just writing a note
Production Command Screens
The system now expects the shop to use the command-center views operationally, not just as office summaries.
Core screens:
/dashboard/orders/due-today/orders/due-tomorrow/orders/all/production-meeting
These screens now show both:
- order lifecycle status
- live production status
That allows the team to read a row as:
Order In ProductionProduction Printing In Progress
instead of only seeing the broad order-level status.
Report Builder
The report builder now behaves more like a database-set ad hoc reporting tool.
Users with report-builder permission can:
- choose a report base
- choose exposed fields from that base and related records
- order the selected columns
- save the report definition
- save runtime search prompts such as date, date range, customer, and PO number
Before relying on it operationally, confirm that the owner or reporting lead understands:
- which bases are available
- which staff should have report-builder permission
- which saved reports should be standardized for management use
Planning Impos
Planning Impos should now be launched from MIS jobs instead of relying on external job imports.
Use:
- the
Planning Imposbutton on order lines - the
Planning Imposbutton on item screens - the
Planning Imposbutton on live work tickets
The planner can also load a job by typed job number and item letter.
Wegmans Small Format
If the Wegmans Small Format module is enabled, the MIS now expects staff to use the module from the left workspace nav instead of treating it like a separate app.
The module includes its own workspace screens for:
- order entry
- tracking
- order status
- press files
- materials and processes
- store directory
- settings
Do not migrate historical tracker data until the MIS module is fully validated with live-safe test data.
CRM
The CRM module is now part of the platform when enabled.
Use:
CRM > CRM Dashboard
Before using CRM in production, confirm:
- reps are assigned correctly
- follow-up ownership is clear
- Outlook / Microsoft calendar connection expectations are documented internally
- quote request review responsibility is assigned to estimating or management
Owner Go-Live Checklist
This checklist is for the owner, president, GM, or senior operator responsible for taking a print company live in Excelsus IQ.
The point of this guide is not just to turn features on. The point is to make sure the shop can actually quote, convert, schedule, produce, invoice, and report inside one system without confusion.
What Go-Live Means
For this system, go-live means all new production work should be able to move through the following flow:
- customer selected
- quote built from catalog data
- quote approved
- order created
- schedule generated
- production clocked
- purchasing and receiving handled if needed
- invoice created
- payment and reporting handled from the same record set
If any one of those steps is still being done outside the system for normal jobs, the shop is not fully live yet.
Owner Responsibilities
The owner should approve:
- pricing policy
- department structure
- job flow logic
- margin strategy
- tax and accounting defaults
- user access
- go-live date
- first-week escalation rules
The owner should not personally enter every record, but should sign off that the people responsible have completed the setup.
Role Ownership Before Go-Live
| Area | Primary Owner | Secondary Owner |
|---|---|---|
| Company settings | Owner / Admin | GM |
| Tax and accounting defaults | Owner / Finance | Admin |
| Vendors and purchasing rules | Purchasing / Admin | Owner |
| Materials | Estimating / Production | Purchasing |
| Machines and speeds | Production Manager | Owner |
| Processes and departments | Production Manager | Estimating Lead |
| Prepress and rush rules | Estimating Lead | Owner |
| Customers and contacts | Sales / CSR | Admin |
| Operator skills and schedule settings | Production Manager | Owner |
| Reports and dashboards | Owner / Finance | Admin |
Phase 1: System Readiness
Confirm each of these is complete.
Company
- company name is correct
- slug is correct
- timezone is correct
- logo and brand color are correct
- order, PO, and invoice prefixes are correct
- proof approval rule is intentionally set
- auto-generate schedule on order is intentionally set
Users And Access
- every active employee has a user record
- each user has the correct role
- managers have the right scheduling access
- report permissions are limited to people who need them
- operators who clock time exist as users
- actual labor rate per hour is filled in where actual labor costing matters
Accounting
- tax rates are loaded
- payment methods are configured
- late fee and grace period are configured
- fiscal year setting is correct
- default income and COGS accounts are set if used
- overhead settings are filled in with real monthly numbers
Phase 2: Catalog Readiness
This is the biggest source of go-live failure in print shops. If the catalog is weak, the quotes become weak immediately.
Vendors
- all primary media vendors are loaded
- all outsource vendors are loaded
- all hardware vendors are loaded
- vendor terms and contacts are entered
Materials
- top selling roll materials are loaded
- top selling sheet materials are loaded
- laminate materials are loaded
- rigid substrates are loaded if the shop prints rigid work
- each material has correct dimensions
- each material has correct current cost
- waste, bleed, gutter, and trim assumptions are reasonable
Machines
- primary printers are loaded
- primary cutters are loaded
- laminators are loaded
- mounting or finishing equipment is loaded where applicable
- pricing model matches how the shop actually prices
- speed unit matches the real work driver
- setup time is realistic
- machine cost calculator is filled in for major machines
Processes
- all recurring finishing steps are loaded
- outsourced steps are loaded with vendor and outsource cost
- schedule-relevant processes are marked correctly
- default machine type and department are assigned where applicable
Hardware
- recurring billable hardware is loaded
- cost per unit is current
- minimum quantity is reasonable
Phase 3: Production Readiness
Departments
- departments are set up for the real shop flow
- sort order matches actual production flow
Recommended examples:
- Printing
- Laminating
- Cutting
- Finishing
- Handwork
- Kitpacking
- Packing
- Shipping
- Installation
Shop Hours And Resource Availability
- shop hours match the real plant hours
- working days match the real week
- holiday closures are entered
- machine-specific overrides are entered where needed
- process-specific overrides are entered where needed
Operator Skills
- key operators are assigned to the machines they actually run
- primary operators are marked where the shop depends on them
- skill levels are not left generic if scheduling should respect skill
Job Flow Rules
- at least one default rule exists
- the rule uses department-first sequencing if that is the intended shop model
- one specialty rule exists if the shop has a common alternate flow
Process Sequences
- only recurring special flows are templated
- edge-case flows are not overbuilt before go-live
Phase 4: Estimating Readiness
Estimating Defaults
- default waste is realistic
- default quote validity is intentional
- default margin group is correct
- quote loading percent is intentional
- below-margin warning is on
- machine selection requirement is intentionally on or off
Prepress
- standard prepress exists
- file prep per version exists
- auto-apply is only enabled for charges that should happen on most items
Rush
- rush rules exist for the turnaround levels the shop actually sells
- percent and minimum values are both reviewed
Margin Groups
- standard margin exists
- premium margin exists if rush or specialty work needs it
- wholesale or trade margin exists if the shop sells to resellers
Phase 5: Customer Data Readiness
Customer Master Data
- top customers are loaded
- each active customer has billing data
- shipping data is complete where needed
- default sales rep is assigned
- default CSR is assigned
- default tax rate is assigned
- tax exempt status is correct
- quote loading, discount, commission, and margin defaults are reviewed
Contacts
- each top customer has at least one active contact
- one contact is marked as default
- email and phone are present where the team relies on them
This matters because quotes and orders inherit their header defaults from the customer.
Phase 6: End-To-End Testing
Do not go live before real test jobs have been run end to end.
Minimum Test Scenarios
Run at least these:
- simple reprint job
- multi-item quote
- multi-version quote
- rush quote
- job with laminate
- job with cutting and handwork
- outsourced step or purchased component
- taxable job
- tax-exempt job
- invoice and payment
For Each Test Job, Confirm
- customer loads correctly
- default contact appears
- sales rep and CSR inherit correctly
- item quantities and versions total correctly
- prepress applies correctly
- rush applies correctly
- machine and process costs calculate
- quote converts to order
- order schedules correctly
- operator can clock in
- actuals update
- PO can be linked if needed
- invoice totals are correct
Go-Live Approval Table
| Area | Approval Question |
|---|---|
| Pricing | Are we comfortable selling from these rates today? |
| Customers | Do quotes and orders inherit the right defaults? |
| Production | Will the default flow match how the floor really works? |
| Scheduling | Can the production manager trust the schedule output? |
| Actuals | Can operators clock in and produce usable labor data? |
| Accounting | Are tax, invoice, and payment defaults acceptable? |
If the answer is no to any of those, delay go-live until the gap is closed.
Cutover Plan
Choose one cutover rule and stick to it.
Recommended Cutover
- existing open jobs stay in the old process if they are close to completion
- all new quotes from the cutover date forward are created in Excelsus IQ
- all approved new quotes become orders in Excelsus IQ
This is usually cleaner than trying to backfill every old job midstream.
Day-Before Go-Live Checklist
- team has been told the go-live date
- estimator guide has been reviewed
- production floor SOP has been reviewed
- one person is assigned as first-line support for sales and CSR
- one person is assigned as first-line support for production
- fallback contact is assigned for accounting and invoicing questions
- browser logins and sessions are working for all users
Day-1 Go-Live Checklist
Morning
- confirm all users can log in
- confirm manual pages are visible in Settings
- confirm one known customer opens correctly
- confirm one new quote can be built
- confirm one quote can be converted to an order
- confirm one order hits the schedule
- confirm one operator can clock into a task
Midday
- review first quotes created that day
- review first orders created that day
- verify no one is bypassing customer defaults manually
- verify schedule steps look correct
End Of Day
- review errors and confusion points
- correct catalog or settings issues immediately
- write down any training gaps
First Week Control Plan
During the first week, the owner or GM should review:
- all quotes over the shop's normal approval threshold
- all rush jobs
- all jobs with unusual finishing
- schedule exceptions
- unassigned or unscheduled tasks
- operator clocking compliance
- invoice totals on the first few jobs
The point is not to micromanage forever. The point is to catch setup defects while the job count is still manageable.
Metrics To Watch During First Month
Track at least:
- quotes created
- quote win rate
- orders scheduled on time
- unscheduled tasks near due date
- average rush use
- time-entry completion rate
- invoice turnaround time
- gross margin on completed jobs
Stop-Ship Conditions
Pause go-live or pause full rollout if any of these happen repeatedly:
- customer defaults are wrong on most quotes
- machine or material rates are obviously unreliable
- schedule is sequencing work incorrectly
- operators cannot reliably clock time
- invoices are calculating incorrectly
- staff are building jobs outside the intended workflow
Final Sign-Off
The owner should be able to answer yes to all of these:
- Do we trust the quote enough to send it to a customer?
- Do we trust the order enough to hand it to production?
- Do we trust the schedule enough to run the floor from it?
- Do we trust the actuals enough to learn from them?
- Do we trust the invoice enough to bill from it?
If yes, the shop is live.
New Modules To Validate Before Full Rollout
The platform now includes several major areas that should be explicitly validated before the shop treats them as production-ready.
Dashboard And Production Meeting
Confirm the team can use:
/dashboard/orders/due-today/orders/due-tomorrow/orders/all/production-meeting
Management should confirm the data is believable enough to run the daily meeting from these screens.
Also confirm those screens show both:
- order lifecycle status
- live production status
The team should be able to read a row quickly without asking:
- is the order generally in production?
- what process is it actually in right now?
Product Catalog
Confirm:
- the Production Library naming is understood
- repeatable products are templated correctly
- fixed unit price products calculate correctly
- customer-locked templates behave correctly
- quote and order launch from product templates works cleanly
Inventory And Requirements Planning
Confirm:
- on-hand balances are loaded
- reserved quantities change correctly
- PO receiving increases inventory
- material usage reduces inventory
- spoilage is being captured
- cycle counts work
- the team knows where the daily requirements report lives
Required report:
Inventory > Daily Requirements- route:
/inventory/requirements
AI Features
Confirm:
- AI infrastructure is configured
- only intended AI features are enabled
- prompt templates are reviewed
- review queue ownership is assigned
- staff understand that AI output is advisory, not autonomous
Customer Portal
Confirm:
- visible statuses are configured
- file upload rules are configured
- reorder behavior is configured
- portal upload and reorder data is visible internally
- customer-facing milestone emails behave correctly
Staff Login And Permissions
Confirm:
- owner login works
- owner knows the organization workspace slug
- each real staff member has a named login
- dashboard, report, accounting, and admin permissions are assigned intentionally
- no shared office-wide credential is being used as the operating model
Module Navigation
Confirm:
- enabled modules appear correctly in the far-left workspace navigation
- staff know to launch modules from the left nav instead of settings shortcuts
- only modules intended for this account are turned on
Microsoft 365 Email Delivery
Confirm:
- Microsoft tenant ID is entered
- Microsoft client ID is entered
- Microsoft client secret is entered
- sender mailbox is entered
- from address is correct
- quote request recipients are correct
- a test email succeeds from
Settings > Notifications > Email Delivery
Do not treat outbound mail as ready just because the values are filled in. Send the test email.
Business Data Import Center
If using bulk upload for initial data load, confirm:
- import templates were used, not ad hoc spreadsheets
- customers and contacts are loaded first
- quotes, orders, and invoices are loaded in order
- imported counts match the source system closely enough
- a human spot-checked several imported customers, orders, and invoices
Report Builder
Confirm:
- report-builder permission is limited to the right users
- the owner or reporting lead understands how to choose a report base and fields
- saved operational reports use the intended runtime prompts such as date range, customer, and PO number
- at least one real saved report has been tested end to end
Quote Intelligence And Dashboards
Confirm:
- the leadership team understands quote intelligence is advisory only
- quote outcomes are being captured as won, lost, expired, or no decision
- loss reasons are being recorded on lost work
- the team understands the difference between quote intelligence and similar completed-job costing
- at least one manager knows how to read win rate by estimator, customer, product type, margin band, and amount band
- at least one scheduling lead understands the promise-date accuracy dashboard and how override behavior affects customer commitments
- vendor scorecards are assigned to a real owner if purchasing is active
NCR And Quality Controls
Confirm:
- NCR schema is applied
- NCR screens load
- NCR create path works from an order or item
- generated and uploaded NCR PDFs are stored correctly
- quality ownership is assigned
Process-Linked Production Statuses
Confirm:
Settings > Production > Process Statusesis configured- production status labels make sense for real processes
- the production meeting and due-order screens show both order and production statuses
- production staff understand that process status drives the floor view while order status remains the job rollup
Wegmans Small Format
If the Wegmans Small Format module is enabled, confirm:
- the Wegmans schema is applied
- order entry, tracking, order status, and press file screens load
- staff know the module is now accessed from the MIS left nav
- the team is not depending on historical job migration before the MIS workflow is validated
Accounting Sync
Confirm:
- QuickBooks or Xero is only enabled after sandbox testing
- source-of-truth settings are agreed
- sync logs are reviewed
- reconciliation and conflict workflows are assigned to a real owner
Local Test Database
Supabase being current is not enough.
The local TEST_DATABASE_URL database used by integration tests also needs to be current. Until that is true, automated regression coverage will continue to skip important end-to-end tests.
Estimator Training Guide
This guide is for estimators, CSRs, sales reps who build quotes, and managers training quoting staff in a print company.
The goal is not just to teach where buttons are. The goal is to teach how to build quotes in a way that protects pricing, production, and handoff quality.
What The Estimator Is Responsible For
An estimator is responsible for turning customer requirements into a quote that production can actually run.
That means the estimator must:
- select the right customer
- confirm the inherited customer defaults
- name the job clearly
- build each item with the correct specs
- choose the right stock, machine, processes, and hardware
- let standard prepress and rush logic apply correctly
- review the final pricing before the quote is sent
What The Estimator Is Not Supposed To Do
Estimators should not:
- override customer defaults casually
- type made-up material costs because a catalog record is missing
- guess machine speeds
- ignore versions or file counts
- use one line item for multiple unrelated products
- send a quote that production cannot interpret
If a recurring stock, process, or hardware item is missing, ask for the catalog to be updated instead of rebuilding it manually over and over.
Before Starting Any Quote
Confirm these first:
- the customer record exists
- the customer has the correct default contact
- the customer has the correct sales rep and CSR
- the customer's tax status is correct
- the customer's margin and discount defaults are correct
Remember: quote and order defaults are pulled from the customer record.
Quote Header Basics
When starting a new quote:
- choose the customer first
- confirm the default contact appears
- confirm the inherited sales rep and CSR
- enter the
Job Name
Job Name
Job Name is the name of the whole quote, not just one item.
Good job names:
- Trade Show Booth Refresh
- Summer Window Campaign
- Fleet Graphics Package
- Restaurant Menu Reprint
Bad job names:
- Sign
- Reprint
- Order
The job name should help anyone opening the quote later understand the overall job immediately.
Quote Line Basics
Each line is one product or item within the overall quote.
Use Item Description for the specific thing being sold on that line.
Good item descriptions:
- 3' x 8' outdoor banners
- counter cards
- wall vinyl graphics
- ACM wayfinding signs
- retractable banner stand graphics
Do not combine unrelated work in one line if it will confuse production or pricing.
Size, Quantity, And Versions
Every line should reflect the real size and quantity structure.
Size
Enter width and height for the actual finished item or the dimension the shop uses for production costing.
Quantity And Versions
The system supports quantity and file or version breakdown rows.
Use them when:
- the same item has multiple versions
- file count affects prepress
- total produced units are quantity multiplied by versions
Example:
- 500 quantity
- 3 versions
- total units = 1,500
If you forget to enter versions correctly, per-version file prep and total quantity logic will both be wrong.
Printing Selection
Choose the correct print orientation or sidedness when relevant.
That impacts:
- production assumptions
- possible prepress logic
- how the job is interpreted later
Do not leave printing assumptions generic if the job is truly 2-sided or multi-pass in a way the shop prices differently.
Customer Defaults The Estimator Must Verify
Once the customer is selected, review these inherited values:
- customer contact
- sales rep
- CSR
- tax
- commission
- automatic discount
- quote loading
If one of those is wrong, the fix usually belongs on the customer record, not just on this one quote.
Material Selection Rules
Use a material record when the shop already buys that stock regularly.
Choose Material Based On Real Production
Ask:
- is it sheet or roll?
- what exact width or sheet size should be used?
- what finish is correct?
- what thickness is correct?
- what vendor cost is represented?
Examples:
- gloss calendared vinyl 54 in roll
- matte banner 38 in roll
- 3 mm ACM 48 x 96 sheet
- 6 mm coroplast 48 x 96 sheet
- 3 mil gloss laminate 54 in roll
Do not estimate from vague materials like:
- vinyl
- banner
- board
If that is all the shop has today, the material catalog needs work.
Machine Selection Rules
Choose the machine that will most likely run the work.
The machine should reflect:
- realistic cost basis
- realistic speed
- real production capacity
Examples:
- wide-format roll printer for vinyl or banner
- flatbed printer for rigid board
- cutter or router where cutting is machine-driven
- laminator where lamination is machine-based
If the shop wants disciplined estimating, do not leave machine selection blank on jobs that clearly require one.
Process Selection Rules
Processes are for the work beyond the base material and machine charge.
Common process examples:
- laminate
- contour cut
- hem
- sew
- grommet
- mount
- pack
- install
- proof
- design
Choose processes when the line truly needs them. Do not add them just because they exist in the catalog.
Hardware Selection Rules
Use hardware for billable accessories or components such as:
- grommets
- standoffs
- frame parts
- hooks
- brackets
- cable kits
Only use hardware when it is a true priced component of the order.
Prepress Rules
The system supports auto-applied prepress.
Standard Prepress
This is usually a fixed charge per item.
Use it when the shop has a baseline file handling or setup charge on most jobs.
File Prep Per Version
This multiplies by the number of versions or files on the item.
Use it when:
- multiple files truly create more prep work
- the shop prices file handling consistently
Examples:
- 1 version -> 1 file prep charge
- 5 versions -> 5 file prep charges
Optional Prepress
Add optional prepress only when the work actually requires it:
- color correction
- variable data setup
- proof creation
- special file cleanup
Rush Rules
Rush is not just a note. If the shop has rush pricing, apply the proper rush rule.
Rush rules use whichever is higher:
- the percentage calculation
- the minimum rush charge
The estimator should:
- confirm the requested turnaround
- choose the matching rush rule
- not hide rush in random line pricing if the shop wants consistent policy
Margin Discipline
Estimators should understand the difference between:
- base cost
- margin target
- quote loading
- automatic discount
- rush
- commission
If the builder warns that pricing is below the intended margin floor, stop and review before sending.
Do not assume a low-margin quote is acceptable just because the total looks large.
Quote Review Checklist Before Sending
Review each quote in this order:
- correct customer?
- correct contact?
- clear job name?
- each item clearly described?
- sizes correct?
- quantity and versions correct?
- correct material?
- correct machine?
- correct processes?
- correct hardware?
- prepress correct?
- rush correct?
- taxes and discounts correct?
- pricing believable?
Common Estimator Errors
Avoid these:
- starting the quote before selecting the customer
- using the wrong customer with the right contact name
- forgetting versions on a multi-version job
- using one line for several different products
- choosing a generic material because the correct one is missing
- forgetting laminate or cutting on work that clearly needs it
- manually compensating for bad setup instead of fixing the catalog
- not checking rush
- not checking tax status
Escalation Rules
Escalate to a manager or owner when:
- the requested turnaround cannot realistically be scheduled
- the correct material does not exist in the catalog
- the correct machine is unclear
- the pricing falls below policy
- the customer wants an unusual exception
- the customer default data is clearly wrong
Revision Discipline
When revising a quote:
- keep the original quote context clear
- update the changed specs only
- do not quietly change unrelated assumptions
If the customer changed quantity, versions, size, stock, or turnaround, review the whole line again. One changed spec often affects more than one cost driver.
Shop-Specific Examples
Wide-Format Banner Quote
Estimator should confirm:
- banner material width is correct
- hem and grommet processes are included
- quantity is correct
- rush is applied if needed
Multi-Location Poster Program
Estimator should confirm:
- each version count is correct
- file prep per version applies correctly
- total units reflect quantity multiplied by versions
Rigid Sign Package
Estimator should confirm:
- rigid board material is correct
- flatbed printer is correct
- cutting or routing process is included
- mounting or finishing is included if needed
Training Exercises
Every new estimator should complete these exercises before quoting alone:
- build a simple one-item reprint quote
- build a multi-item quote
- build a quote with three versions on one item
- build a quote with laminate and cutting
- build a rush quote
- correct an intentionally bad customer default
Sign-Off Standard
An estimator is ready to quote alone when they can do all of the following without coaching:
- select the correct customer and confirm inherited defaults
- build a clean item structure
- handle quantity and version rows correctly
- choose the correct material, machine, process, and hardware
- apply prepress and rush correctly
- review the quote for pricing and handoff quality
If they cannot do those six things consistently, they are not ready to own customer-facing quotes.
New Estimating Tools
Several new estimating tools are now in the system. Estimators should understand when to use them and when not to rely on them blindly.
Product Catalog
Use Product Catalog when the job is a repeatable, prebuilt product.
Examples:
- standard banners
- yard signs
- posters
- recurring store kits
- other repeatable shop programs
The Product Catalog can now:
- preload material, process, machine, hardware, and sizing assumptions
- use customer-locked or customer-optional templates
- use fixed unit pricing, fixed total pricing, or calculated pricing
If a product template already exists, use it instead of rebuilding the job from scratch.
AI Quote Intake
Natural-language quote intake can now parse a customer request into a draft intake record.
Use it when:
- the request comes in as raw customer language
- the CSR or estimator wants a faster first-pass extraction
Do not treat it as final truth. Review:
- material
- quantity
- versions
- size
- finishing
- due date assumptions
If the AI run is flagged, check the AI review queue before trusting the draft.
Win Probability
Quote detail now includes win probability output and explanation support.
Use it as a decision-support signal, not as permission to underprice work.
Good uses:
- deciding which quotes deserve follow-up attention
- identifying deals that may need pricing review
- seeing whether timing or margin pressure is affecting close odds
Bad uses:
- lowering price automatically just because the score is lower than expected
The quote-intelligence panel is most useful when the estimator reviews:
- win probability
- confidence
- recommended action
- top drivers
- similar historical quotes
Use it like this:
- high score plus high confidence: treat the quote like a real closing opportunity and move fast
- lower score with pricing pressure: review margin, scope, alternates, and customer expectations before chasing harder
- lower score with revision pressure: tighten scope and get the real decision-maker aligned
- strong customer and product history: prioritize follow-up because the pattern is favorable
Do not confuse similar historical quotes with similar completed jobs.
- quote intelligence compares this quote to resolved quote history
- the similar-jobs view compares a line to completed jobs with actual cost history
Use quote intelligence to decide how to pursue the sale. Use similar jobs to decide whether the pricing and production assumptions make sense.
Predictive Promise Date
Quote and order flow now include promise-date guidance.
Estimators should review:
- optimistic date
- recommended date
- high-risk date
- explanation of capacity or backlog pressure
If the customer wants a date earlier than recommended, escalate. Do not quietly overpromise.
Production Library Import Center
There is now a bulk import path for:
- materials
- laminate
- hardware
- processes
- machines
If a recurring stock or hardware item is missing, use the import center or have the admin update it there. Do not keep inventing manual one-off records in active quotes.
CRM Quote Request Workflow
If CRM is enabled, not every quote request starts inside the quoting screens.
Sales can now submit quote requests through CRM and route them to estimating or management review.
Estimators should understand:
- rep quote requests may arrive from CRM
- the quote request must be reviewed before it is sent back to the rep
- the MIS quote record may be linked back to the CRM request
Do not bypass this review path by emailing numbers back informally if the request was submitted through CRM.
Order Status Versus Production Status
Estimators should understand the difference because customers often ask for “status” and the system now shows two kinds.
Order lifecycle status is the whole-job rollup:
- new
- in production
- ready
- shipped
- invoiced
Production status is the live shop step:
- printing in progress
- printing paused
- finishing done
- proof / approval
When promising dates, use the production context, not just the broad order status.
NCR Awareness For Estimating
Estimators do not usually create NCRs, but should understand them because NCR cost and root-cause data feed future pricing quality.
When NCRs accumulate on a product or material combination, estimating should review:
- setup assumptions
- spoilage assumptions
- speed assumptions
- labor assumptions
- outsourced finishing assumptions
If estimating never reacts to NCR and actuals data, estimates drift away from reality.
Production Floor SOP Guide
This guide is for production managers, leads, operators, finishers, pack-out staff, and anyone on the floor using Excelsus IQ to run print work.
It is written as a standard operating procedure for print companies that want the schedule, task status, time tracking, and production handoff to stay clean.
Purpose
The purpose of this SOP is to make sure production staff:
- work from the scheduled job data
- follow the intended department sequence
- clock time correctly
- catch spec issues before production starts
- hand work off cleanly between departments
- close jobs with accurate actuals
Core Rule
The floor should run from the order and schedule, not from memory, hallway conversations, or scraps of paper.
If the screen and the floor disagree, stop and resolve that conflict before work proceeds.
Roles On The Floor
| Role | Main Responsibility |
|---|---|
| Production Manager | owns schedule, priorities, escalations, and re-sequencing |
| Department Lead | verifies readiness and handoff quality inside the department |
| Operator | runs assigned task, clocks time, updates progress, reports problems |
| Finisher / Handwork Staff | completes process tasks in sequence and reports exceptions |
| Packing / Shipping Staff | verifies quantity, packaging, labels, and shipment readiness |
Start-Of-Day SOP
At the start of each shift:
- review the schedule board
- check overdue or blocked tasks
- confirm today's priority jobs
- confirm machine availability
- confirm staffing and call-outs
- confirm material readiness for priority work
The production manager should identify any jobs that are:
- due today
- rushed
- blocked
- missing stock
- waiting for proof or customer clarification
Before Starting Any Task
Before an operator starts a task, confirm:
- this is the correct job
- this is the correct item
- this task is ready in sequence
- required material is available
- dimensions and quantity make sense
- the machine or process matches the task
Do not start work just because the job is physically nearby. Start it because the task is ready and correct.
Readiness Check
If any of these are unclear, stop and escalate:
- missing stock
- wrong stock
- missing art or proof status
- wrong quantity
- wrong version count
- wrong finishing path
- wrong due date priority
Clock-In SOP
Operators should clock into the actual scheduled task they are starting.
Clock in when:
- setup work begins
- production work begins
- finishing work begins
Do not wait until the middle of the run. Setup time is part of the real task cost and schedule impact.
During Task Execution
While running a task:
- stay on the assigned job unless re-prioritized by the lead or manager
- record issues immediately
- monitor quality continuously, not only at the end
- stop if the job is clearly wrong or unsafe to proceed
Quantity Completion SOP
When pausing or finishing a task:
- enter quantity completed accurately
- do not guess if actual count is available
- if spoilage matters, communicate it to the lead or manager immediately
Bad quantity actuals create bad schedule and costing data for the rest of the job.
Department Handoff SOP
When one department finishes and another will take over:
- confirm quantity completed
- confirm job materials stay with the job
- confirm any special instructions are visible
- confirm the next department is not blocked by a missing piece
Examples:
- Printing to Laminating
- Laminating to Cutting
- Cutting to Handwork
- Handwork to Packing
- Packing to Shipping
The handoff is not complete until the next department can act without guessing.
Printing Department SOP
Before printing:
- verify substrate
- verify size
- verify print orientation or sidedness
- verify version count if applicable
- verify artwork release or proof status
- verify machine assignment
During printing:
- monitor first output carefully
- watch for color, banding, registration, or media-feed issues
- stop if output is clearly not saleable
After printing:
- stage prints cleanly for the next step
- label or separate versions if needed
- do not mix versions
Laminating Department SOP
Before laminating:
- verify the correct laminate type
- verify finish
- verify cure or wait time if the shop requires it
- verify the correct item count
During laminating:
- watch silvering, skew, bubbles, and edge issues
- stop if the film or output is not acceptable
After laminating:
- keep work identified by item and version
- protect edges and surfaces before handoff
Cutting Department SOP
Before cutting:
- verify the correct file or cut path
- verify the correct material stack
- verify quantity and version separation
- verify whether cut tolerance matters for the product
During cutting:
- inspect first-piece accuracy
- do not continue a bad cut path because the machine is already running
After cutting:
- count usable output
- separate remakes or defects
- send only acceptable pieces forward
Handwork And Finishing SOP
For handwork tasks such as:
- grommeting
- hemming
- taping
- assembly
- kitting
- packaging preparation
Confirm:
- count is correct
- orientation is correct
- finishing instructions are present
- all required accessories are available
Packing SOP
Before packing:
- confirm finished quantity
- confirm all versions or item groups are included
- confirm accessories are included
- confirm packing standard for the customer
Packing errors are customer-facing errors. Treat this as a quality gate, not as an afterthought.
Shipping SOP
Before shipping:
- confirm the job is truly complete
- confirm packaging is correct
- confirm labels or shipment references are correct
- confirm any will-call or delivery instructions are correct
Do not mark work as ready to ship if it is still waiting on:
- missing quantity
- missing hardware
- missing paperwork
- pending rework
Pause And Problem SOP
Pause work and escalate when:
- material is wrong
- quantity is wrong
- art is wrong
- cut path is wrong
- machine output is unacceptable
- next step is unclear
- due date priority changed
The correct behavior is to stop a bad job early, not to finish a bad job quickly.
Rework SOP
If a task needs rework:
- notify the lead or manager
- identify the cause
- separate rework from good output
- do not silently pass defects to the next department
The team should know whether the problem came from:
- data or quoting
- material
- machine output
- operator error
- finishing damage
End-Of-Task SOP
At the end of each task:
- clock out or pause correctly
- enter quantity completed
- add notes if something important happened
- confirm the next department is not blocked unnecessarily
End-Of-Shift SOP
At the end of each shift:
- close active time entries unless instructed otherwise
- stage in-progress jobs safely
- identify jobs that are blocked
- identify jobs that need priority tomorrow
- leave machine and work area in proper condition
The production manager or lead should review:
- open in-progress tasks
- overdue tasks
- blocked tasks
- jobs that are short of due-date expectations
Data Discipline Rules
The floor should follow these rules every day:
- always clock into the real task
- always update quantity honestly
- never mark complete if the job still needs work
- never skip reporting a problem because it seems small
- never pass unknown work to the next department
What Production Should Escalate Back To CSR Or Estimating
Escalate when:
- customer-facing specs do not match physical reality
- the quote missed a major finishing step
- quantity or versions do not match the production need
- material selected is not appropriate
- due date expectation is unrealistic
Production should not quietly absorb those mistakes forever. The system only improves if those issues are fed back to the people who set the job up.
Daily Management Review
At least once per day, production leadership should review:
- rushed jobs
- unscheduled tasks
- blocked tasks
- overdue work
- jobs with heavy rework
- jobs with missing time entries
First-Principles Standard
The floor should be able to answer yes to these questions at any time:
- Do we know what to run next?
- Do we know whether the current task is actually ready?
- Do we know who is working on it?
- Do we know how much is done?
- Do we know what the next department needs?
If the answer is no, stop and clean up the workflow before the confusion spreads.
Production Command Center SOP
The main dashboard is now a shared production command screen, not just an office summary page.
Supervisors, leads, CSR, and management should use:
DashboardOrders Due TodayOrders Due TomorrowAll OrdersProduction Meeting
The Production Meeting screen is the meeting-safe view for the 9:00 AM review.
Use it to review:
- all orders due today
- all orders due tomorrow
- blocked jobs
- jobs waiting on proof, files, or customer action
- jobs with pinned or important internal notes
These operational screens now show two statuses together:
- order lifecycle status
- live production status
Read them differently:
- order lifecycle status tells you where the full order stands commercially and operationally
- production status tells you what process the floor is actually in right now
Example:
Order In ProductionProduction Printing In Progress
That is intentional. Production should not rely on only the broad order status when deciding what to do next.
Process-Linked Status SOP
Production status is now tied to tracked production processes.
This means:
- printing tasks should surface printing statuses
- finishing tasks should surface finishing statuses
- shipping-related tasks should surface shipping statuses
Managers and owners configure the shop-facing production statuses in:
Settings > Production > Process Statuses
Floor staff should not manually reinterpret those labels. If a label is wrong, fix the process-status mapping instead of creating local workarounds.
NCR SOP
The system now includes NCR tracking for real quality events.
Use NCRs when:
- work must be redone
- quality failure needs formal documentation
- cost impact must be captured
- root-cause analysis is needed
Do not use NCRs for:
- routine operator notes
- normal setup observations
- informal reminders that belong in production notes
Create an NCR from:
- the order
- the item screen
- the live work ticket
Production leads should review NCR trends during the week, not only when a customer complains.
Daily Material Requirements SOP
The main daily material planning report is:
Inventory > Daily Requirements- direct route:
/inventory/requirements
This report should be reviewed every day by production leadership and purchasing.
Use it to answer:
- What jobs need material today?
- What jobs need laminate today?
- What hardware is required for upcoming work?
- What is allocated already?
- What is still short on hand?
Each row shows:
- job number
- customer
- due date
- job / line description
- component type
- quantity needed
- unit of measure
- job allocated quantity
- inventory reserved quantity
- inventory on-hand quantity
- inventory available quantity
Material Usage Capture SOP
Material usage entry is now part of inventory accuracy.
Operators are required to record material usage on tasks where the machine or process is marked:
Requires Material Usage Capture
This is configured in the Production Library on:
- machines
- processes
In practice, this is typically used for:
- print processes
- precut / cutting processes
- laminate-consuming finishing steps when the shop wants actual laminate usage recorded
When recording usage, the operator should enter:
- actual quantity used
- spoilage quantity
- notes if there was overrun or waste
If actual usage exceeds the reserved quantity, the system still deducts the overrun so stock stays honest.
Inventory Discipline Rules
Production should follow these rules:
- Do not pull material without checking the allocation or requirement.
- Do not leave material usage blank on capture-required tasks.
- Record spoilage when it happens, not later from memory.
- Use inventory adjustments for stock corrections instead of hiding the problem in task notes.
- Escalate material shortages during the production meeting, not after the due date slips.
Cycle Count SOP
Inventory now supports cycle counts and count sheets.
Use cycle counts to verify:
- high-value material
- laminate
- frequently used stock
- material with repeated shortages
Cycle count workflow:
- create the count
- count the listed stock by location / bin / lot
- review the variance
- finalize the count and correct the inventory record
Reporting And Intelligence Guide
This guide explains what reporting data Excelsus IQ is meant to give a print company, how the reporting tools actually work, and what actions managers, estimators, customer service, production, purchasing, and finance should take from that data.
The goal is not to create more dashboards for their own sake. The goal is to help the shop use one clean operating record set for decisions.
What Reporting Is Supposed To Do
In this system, reporting should help the shop answer questions like:
- what is due and at risk right now
- what is profitable and what only looks busy
- where we are leaking time, waste, or margin
- which customers and product types convert well
- which quotes need action today
- which vendors are helping or hurting execution
- how much cash is still open
If reports are not tied to real actions, the team will stop trusting them.
Source-Of-Truth Rule
The reports only stay useful if the operating data is clean.
That means:
- quotes should be built from real customer, catalog, and pricing defaults
- approved quotes should become orders instead of being retyped elsewhere
- production should clock time against the real scheduled tasks
- purchase orders and receiving should be recorded in the system
- invoices and payments should be recorded against the correct customer and job
- quote outcomes should be captured after the sale is won, lost, expired, or abandoned
Bad source data creates misleading reports. Reporting is not the place to fix operating discipline after the fact.
Reports Center Structure
The reports area is split into several access-controlled sections.
| Section | Main Purpose | Typical Users |
|---|---|---|
| Standard Reports | Fast operational views and prebuilt report links | managers, CSRs, sales, operators with permission |
| Report Builder | Ad hoc exports across multiple datasets and related records | owner, admin, reporting lead, selected managers |
| Accounting Reports | receivables, revenue, profitability, commissions, invoice operations | owner, finance, admin, selected managers |
| Dashboards | KPI and intelligence views for sales, scheduling, efficiency, and purchasing | owner, managers, selected leads |
| Invoice Reports | invoice review, payment allocation, ready-to-bill jobs | finance, admin, CSR, selected managers |
Use the simplest section that answers the question.
- Use Standard Reports when the answer already exists.
- Use Report Builder when you need your own column mix.
- Use Dashboards when you need trends, patterns, or decision support.
- Use Accounting Reports and Invoice Reports when money movement is the real question.
Standard Reports
Standard reports are the fastest path for recurring operational questions.
They are meant for things like:
- job pipeline review
- customer tax-default review
- quote register review
- purchase order review
- vendor directory review
- invoice operations shortcuts
Use these when the team needs repeatable answers without redesigning a report every time.
Report Builder
Report Builder is the ad hoc reporting tool. It is built for users who know the question they want answered and need to choose the exact fields and output order.
The builder supports these current report bases:
| Report Base | Best Use |
|---|---|
| Customer | customer defaults, tax, rep, CSR, terms |
| Customer Contact | contact directory and account ownership |
| Quote | quote register and quote-level analysis |
| Quote Items | item-level estimating analysis |
| Order | operational job pipeline and customer PO tracking |
| Order Items | item-level production and value analysis |
| Invoice | invoice review and billing analysis |
| Invoice Items | line-level billing analysis |
| Payments | payment audit and cash-application review |
| PO | purchasing status and received-value tracking |
| PO Items | component-level purchasing review |
| Suppliers | vendor directory and supplier master-data review |
How To Use Report Builder Correctly
Build reports from the question backward.
Good examples:
- which rush jobs due this week are still not shipped
- which jobs for one customer still have open balance
- which quotes over a certain amount expired this month
- which PO items were received late from one vendor
Bad examples:
- adding every possible column because it might be useful later
- saving reports with no naming standard
- using the builder when a standard dashboard already answers the question
Recommended Builder Workflow
- choose the right report base first
- add only the fields needed to answer the question
- set output order so the most important columns come first
- save runtime filters if the report will be reused by date, customer, PO number, status, or similar prompts
- save the report with a clear business name
Good saved report names:
- Open Rush Jobs By CSR
- Uninvoiced Shipped Orders
- Declined Quotes Over 2500
- POs Due This Week
Bad saved report names:
- Test
- Report 2
- Custom Export
Runtime Filters
Saved builder reports can preserve runtime filter prompts such as:
- date
- date range
- customer
- status
- PO number
- text contains search
That matters because the saved report should preserve the structure of the question without freezing the answer to one day forever.
What To Do With Builder Output
Use builder output for:
- management reviews
- export-to-CSV work
- one-off audits
- customer-specific or rep-specific operating lists
- exception reports
Do not use builder exports as a permanent shadow system. If a saved report becomes mission-critical, standardize the naming, owner, and review cadence.
Dashboards
Dashboards are where the system moves beyond list views and starts showing patterns.
The dashboards section includes:
- financial and KPI snapshots
- win / loss review
- quote intelligence
- promise date accuracy
- efficiency reporting
- constraint dashboard
- vendor scorecards
- vendor pricing changes
These are not all for the same audience.
Dashboard Use Rule
Every dashboard should answer one of these:
- where do we need to act today
- what pattern is improving or worsening
- which team or process needs coaching
- where are we taking risk without realizing it
If the team cannot name the action, the dashboard is just decoration.
Quote Intelligence
Quote Intelligence exists in two forms:
- a per-quote intelligence panel on quote detail
- a dashboard report showing pattern trends across quote history
Both are advisory only. They are meant to improve follow-up, pricing discipline, and understanding of what the shop wins well.
What The Per-Quote Intelligence Panel Shows
On the quote itself, the panel shows:
- win probability
- confidence level
- recommended action
- resolved history count
- explanation text
- top drivers
- similar historical quotes
- outcome feedback controls
How The Quote Score Works
The current engine is rules-based. It does not make up an answer from nothing.
It starts from historical resolved quote outcomes and adjusts the score using factors such as:
- customer history
- product history
- sales rep history
- margin band
- quote amount band
- quantity band
- revision count
- first response versus revised quote
- competitive pricing pressure
- seasonality
- turnaround pressure
- similar historical quotes
The system then assigns:
- a win probability percent
- a confidence label
- a recommended action
Recommended Actions
The current action categories are:
| Recommendation | What It Means Operationally |
|---|---|
| Aggressive Follow-Up | good conversion signal, deserves active pursuit |
| Standard Follow-Up | normal follow-up cadence is appropriate |
| Pricing Review | the deal may be at risk because of price or margin pressure |
| Low Priority | weak conversion signal, do not over-invest time without another reason |
Confidence
Confidence tells you how much clean history the score had to work with.
- High confidence means there is enough history and enough matching factors to lean on the result more heavily.
- Medium confidence means useful signal exists, but judgment still matters.
- Low confidence means the system is showing a directional clue, not a strong prediction.
Do not confuse a high score with high confidence. A quote can score well with thin data and still deserve human caution.
Top Drivers
Top drivers explain why the score moved.
Examples:
- customer history is strong
- comparable product types close well
- multiple revisions are hurting odds
- rush pressure is making the deal riskier
- pricing-sensitive notes or loss history suggest competitive pressure
This is the part managers and estimators should actually read.
The right use is:
- if price pressure is negative, review pricing strategy
- if revision pressure is negative, tighten scope and get decision-makers aligned
- if customer and product history are strong, prioritize follow-up and speed
Similar Historical Quotes
The quote panel shows similar historical quotes, not similar completed jobs.
Those matches are driven by items such as:
- same customer
- shared product type
- same sales rep
- similar quote amount band
- similar quantity band
- similar turnaround pressure
Use similar historical quotes to answer:
- have we won this kind of quote before
- is this customer usually a closer or a shopper
- are we seeing the same kind of quote come back repeatedly
Do not use similar historical quotes as a substitute for actual cost history.
Similar Historical Quotes Versus Similar Jobs
This distinction matters.
- Quote Intelligence uses historical quote outcomes.
- The quote builder's similar-jobs view uses completed jobs with actual cost data.
Use quote intelligence when the question is:
- are we likely to win this
- what is making the deal stronger or weaker
Use similar jobs when the question is:
- how did close-to-this work actually cost out in production
- what margin did we really earn on similar specs
Outcome Feedback
Outcome feedback is the training and analytics label for quote history.
Capture:
- won
- lost
- no decision
- expired
When a quote is lost, also capture:
- reason lost
- competitor
- pricing notes
- freeform notes
This does not automatically change the entire operational quote status model by itself. It labels the quote for future analysis and intelligence.
If the team never records outcomes, quote intelligence becomes thin and unreliable.
Quote Intelligence Dashboard
The Quote Intelligence dashboard is the cross-quote pattern view.
It tells you things like:
- resolved quote count
- won quote count
- overall close rate
- recommendation mix
- win rate by estimator
- win rate by customer
- win rate by product type
- margin bands versus close rate
- turnaround pressure versus close rate
- quote amount bands versus close rate
How To Use Quote Intelligence Data
Use win rate by estimator to:
- spot coaching needs
- see who is qualifying well
- identify quoting teams that need pricing or scope discipline
Use win rate by customer to:
- identify strategic accounts
- identify chronic shoppers
- decide where relationship effort pays back
Use win rate by product type to:
- see what the shop wins best
- identify offerings that may be overquoted or poorly positioned
- decide where to focus sales energy
Use margin bands versus close rate to:
- test whether the shop is underpricing to win
- find where margin is healthy without collapsing close rate
- separate real pricing pressure from estimator fear
Use turnaround pressure versus close rate to:
- see whether rushed work is actually worth chasing
- coach staff on when rush promises reduce close quality or execution quality
Use amount bands versus close rate to:
- understand which deal sizes convert best
- see whether small quotes are consuming too much effort
- identify strategic thresholds where management review should be required
What Quote Intelligence Should Not Be Used For
Do not use it for:
- automatic discounting
- approving bad-margin work just to increase close rate
- blaming one rep from small sample sizes
- treating one dashboard period as permanent truth
It is meant to improve judgment, not replace it.
Win / Loss Reporting
Win / Loss reporting is the more direct sales-outcome view.
It is built for:
- total quoted dollars
- won dollars
- win rate
- average margin on won jobs
- loss reasons
- rep rows
- quote detail rows
Use it when management wants direct sales-performance review instead of predictive pattern review.
How To Act On Win / Loss Data
- If loss reasons cluster around price, review estimating strategy and competitor pressure.
- If loss reasons cluster around timeline, review promise-date discipline and shop capacity.
- If one rep wins at low margin, coach qualification and pricing.
- If won dollars are high but average margin is weak, revenue quality needs attention.
Promise Date Accuracy
Promise Date Accuracy is a scheduling-intelligence tool, not just a report.
It tells the team:
- how many jobs were predicted
- how many shipped
- on-time rate
- override rate
- forecast accuracy distribution
- override outcomes
- departments causing promise risk
- on-time performance mix
How To Use Promise Date Data
Customer service and production should use it to answer:
- are we overpromising
- are managers overriding the recommended date too often
- which departments are creating backlog risk
- whether override behavior is helping or hurting on-time delivery
Good actions from this dashboard:
- adjust commitment discipline
- escalate staffing or machine bottlenecks
- stop promising dates earlier than the shop can hold
Efficiency Reporting
Efficiency reporting answers whether production is running close to plan.
Current areas include:
- waste reporting
- operator efficiency
- makeready reporting
Waste Reporting
Use waste reporting to review:
- spoilage cost
- waste percent
- weekly waste trends
Act on it by:
- finding repeat spoilage causes
- revising setup assumptions
- retraining process steps
- tightening quality gates
Operator Efficiency
Use operator efficiency to compare estimated versus actual hours.
Act on it by:
- finding consistent overruns
- coaching on setup discipline
- checking whether estimates are unrealistic
- separating a training issue from a planning issue
Makeready Reporting
Use makeready reporting to review setup time, run time, and trend direction by machine.
Act on it by:
- seeing where setup is drifting longer
- deciding when routing or batching needs to change
- validating machine standards against real time
Constraint Dashboard
The Constraint Dashboard shows queue dwell and bottleneck behavior between departments.
Use it when the shop feels busy but cannot clearly identify where work is sticking.
It helps answer:
- where jobs are waiting longest
- which departments are driving downstream delay
- which specific jobs are sitting in the bottleneck
This is for production leadership and operations review, not estimator guesswork.
Vendor Scorecards And Vendor Pricing Changes
Purchasing dashboards help the shop manage supplier quality and cost movement.
Vendor scorecards show measures like:
- on-time rate
- incidents
- spend
- receipt price drift or variance
Use them to:
- move work away from unreliable vendors
- support better vendor review conversations
- avoid paying higher prices without noticing
Vendor pricing changes help the shop review submitted supplier cost updates and maintain approval history.
Use that data to:
- control cost updates before they silently change estimating quality
- document who approved price changes
- keep catalog costing current
Accounting Reports
Accounting reports answer financial questions rather than pure operating questions.
They cover areas like:
- A/R aging
- revenue
- job profitability
- commissions
- overhead recovery
- invoice operations
How To Use Accounting Data
Use A/R aging to:
- prioritize collections
- spot chronic late payers
- decide whether new work needs tighter terms
Use revenue reports to:
- review monthly billing trends
- compare expected sales performance against actual invoiced work
Use job profitability to:
- compare estimate versus actual
- find jobs that looked profitable but were not
- improve future pricing and production standards
Use commissions to:
- validate payout logic
- catch disputes before payroll closes
Use overhead recovery to:
- see whether the shop is covering its fixed operating burden through real work volume
Invoice Reports
Invoice Reports are the operational billing workspace.
Use them for:
- invoice review
- payment allocation
- identifying open balances
- seeing ready-to-invoice jobs
This is where finance, admin, or CSR staff should work when they are trying to complete the billing cycle instead of just reviewing a KPI.
Role-Based Use Of Reporting
Owner Or GM
Use reporting to manage:
- revenue quality
- margin health
- close rate trends
- overdue receivables
- vendor performance
- bottlenecks
Main screens:
- Dashboards
- Accounting Reports
- Quote Intelligence
- Job Profitability
- Promise Date Accuracy
Estimating Lead
Use reporting to manage:
- close rate by product type
- margin bands versus close rate
- similar jobs with actuals
- NCR and waste feedback loops
Main screens:
- Quote Intelligence
- Win / Loss
- Job Profitability
- similar-jobs view in quote builder
CSR Or Sales Management
Use reporting to manage:
- follow-up priorities
- customer behavior
- rep performance
- due-date risk
Main screens:
- Quote Intelligence
- Win / Loss
- Job Pipeline
- Promise Date Accuracy
Production Manager
Use reporting to manage:
- queue risk
- operator overrun
- waste
- setup drift
- due-order risk
Main screens:
- Constraint Dashboard
- Efficiency reports
- Promise Date Accuracy
- daily requirements and due-order views
Purchasing
Use reporting to manage:
- PO status
- received value
- supplier performance
- price changes
Main screens:
- Purchase Order reports
- Vendor Scorecards
- Vendor Pricing Changes
Finance
Use reporting to manage:
- A/R
- revenue
- payment allocation
- profitability
- overhead recovery
Main screens:
- Accounting Reports
- Invoice Reports
- Financials dashboard
Data Hygiene Checklist For Reliable Reporting
If the shop wants trustworthy data, confirm these are true:
- quote outcomes are captured
- loss reasons are not left blank on lost work
- quote statuses are not left stale
- customer defaults are maintained on the customer record
- sales reps and CSRs are assigned correctly
- tax settings are correct
- approved quotes become orders instead of being recreated manually
- tasks are clocked in and out accurately
- quantity actuals are recorded honestly
- waste and NCR events are captured when they matter
- POs are received in the system
- invoices are created from the real work
- payments are allocated to the correct invoice
Common Reporting Mistakes
Avoid these:
- judging a rep, customer, or product type from too little history
- reading a low-confidence quote score as a final answer
- using revenue without also checking profitability
- using close rate without checking margin quality
- using overdue counts without checking dollar exposure
- saving builder reports with unclear names and no owner
- exporting to spreadsheets and then trusting the spreadsheet more than the MIS
Daily, Weekly, And Monthly Cadence
Daily
Review:
- dashboard summary cards
- due and at-risk work
- promise-date risk
- invoice and ready-to-bill queue
Weekly
Review:
- win / loss
- quote intelligence patterns
- waste and operator efficiency
- vendor issues
- open A/R exceptions
Monthly
Review:
- revenue
- profitability
- overhead recovery
- customer and product-type close-rate trends
- estimator coaching needs
- vendor performance drift
Final Rule
The value of reporting is not that the system can calculate a number.
The value is that the team uses that number to:
- change priorities
- correct setup
- coach behavior
- improve pricing
- protect margin
- improve delivery performance
If the data never changes behavior, the reporting stack is unfinished even if every chart loads.